Installation and debugging of auxiliary equipment of sawdust briquette machine
As one of the auxiliary equipment of
sawdust briquette machine, belt conveyer is a kind of conveying equipment with low operating cost and wide range of application. It is suitable for conveying bulk material or object. Here's how to install and debug a belt conveyer.
I. Steps of installing belt conveyer:
Belt conveyer is usually shipped as finished unit. Collision should be avoided when unloading and avoid the deformation of parts when swinging. When installing the belt conveyer, the following problems should be paid attention to.
1. The encasement of unit contains the transmission part is generally required when the goods are delivered. Avoid bumps when unpacking. Dirty driving parts should be cleaned before installation of the belt conveyer.
2. Installation of the belt conveyer should be made according to the requirements of the drawing and the moving parts should be flexible. Each tensioning device shall be adjusted according to the requirements.
3. The storage and transportation of summer equipment should be protected from rain, and direct contact with rainwater should be avoided.
4. Installation of belt conveyer generally does not need to be pre-embedded. Fix the equipment with the expansion bolt and the equipment foot margin height can be adjusted, so there is no special requirement on the ground. The distribution map and load of foot margin should be provided.
5. When installing a belt conveyer, draw the center line of all the equipment on the ground according to the dimensional requirements of the general drawing and the center line must be consistent with the center line of related equipment. Install the equipment according to the line and fix the food margin with expansion bolts.
6. Adjust the elevation, straightness and levelness of each conveying surface according to the requirements of the drawing.
7. Laying electric tank (pipe).
8. Install power distribution cabinet (box), wiring, etc.
Ii. Steps of debugging belt conveyer:
1. Carefully adjust the belt conveyer after installation of each equipment to meet the design requirements.
2. Each reducer and moving parts should be added with corresponding lubricating oil.
3. After the belt conveyer reaches the requirements, each equipment shall carry out manual work test, and adjust the
belt conveyer to meet the requirements of the movement.
4. Adjust the electrical part of the belt conveyer, including the commissioning of routine electrical wiring and the movement to make the equipment has good performance and achieve the design function and state.